Changing due date doesn't update "days left" information
Bug #1047753 reported by
Francesco Turco
This bug affects 2 people
Affects | Status | Importance | Assigned to | Milestone | |
---|---|---|---|---|---|
GTG |
Fix Released
|
High
|
Codee |
Bug Description
I'm using GTG 0.2.9 on an Arch Linux system.
In task editor, when you change the due date without using the internal calendar (i.e. by entering the date manually), the informations on the right side (for example "Due tomorrow!") is not updated. Those informations are instead correctly updated when using the internal calendar.
Related branches
lp:~kmhpfoss/gtg/bug-fix-
- Izidor Matušov: Approve (code, run)
-
Diff: 27 lines (+5/-0)1 file modifiedGTG/gtk/editor/editor.py (+5/-0)
Changed in gtg: | |
status: | New → Confirmed |
importance: | Undecided → High |
summary: |
- Changing due date doesn't update right side informations + Changing due date doesn't update "days left" information |
Changed in gtg: | |
milestone: | 0.3.1 → 0.4 |
Changed in gtg: | |
assignee: | nobody → Codee (kmhpfoss) |
Changed in gtg: | |
status: | Confirmed → Fix Committed |
milestone: | 0.4 → 0.3.1 |
Changed in gtg: | |
status: | Fix Committed → Fix Released |
To post a comment you must log in.
Thank you for reporting this bug. I think we don't manage to repair it until the release GTG 0.3, postponing to milestone GTG 0.3.1